Oil Production in Muradkhanli Field to Be Increased to 220 B / D
Baku/28.08.17/ Turan: A new generation submerged pump from Schlumberger was installed in the well M-45 of the Muradkhanly land oilfield.Information about this was spread by the Canadian company Zenith Energy Ltd., operator of the Muradkhanli-Jafarli-Zardab block of deposits.Daily oil production from the well is 49 barrels now. Zenith is confident that the volume of production from the well will increase. This is the first equipment of this type installed by the company on the ...